Filter Semmco’s range of products
Close Filter  
Use the fields below to filter the Semmco range of products

You are currently filtering to show Aviation products RESET

Wi-Fi Access Maintenance Stand

Wi-Fi Access Maintenance Stand

Part No: 912.000.74

Semmco’s unique variable height Wi-Fi platforms provide safe access to the aircraft crown/fuselage for Wi-Fi installation and periodic professional aircraft maintenance.Designed to accommodate the CRJ

Universal Landing Gear & Wheel Bay Access Platform

Universal Landing Gear & Wheel Bay Access Platform

Part No: 812.012.42

The Universal Landing Gear & Wheel Bay Access Platform is a variable height platform with a height range from 1.7m to 3m  via a winch mechanism with manual winding handle.  The working platform

Universal Landing Gear & Wheel Bay Access Platform Trailer

Universal Landing Gear & Wheel Bay Access Platform Trailer

Part No: 812.210.00

This trailer is used to transport the Universal Landing Gear & Wheel Bay Access Platform (812.012.42) to service aircraft while on the line.  The platform collapses so that it can be wheeled onto

Fixed Height Main Landing Gear Access Platform LH H1.68m

Fixed Height Main Landing Gear Access Platform LH H1.68m

Part No: 812.012.22

The Main Landing Gear Maintenance Platform - Fixed Height is designed to enable access to the wheel bay of a range of aircraft to service the wheel struts. The platform is designed to fit around the wheel

Fixed Height Engineers Maintenance Platform

Fixed Height Engineers Maintenance Platform

Part No: 812.450.02

Designed for use in hangars or on ramps, the Fixed Height Engineers Maintenance Platform is a robust but lightweight aluminium constructed stair & working platform (W3.0 x L1.6m).  It is easy to manoeuvre

Fixed Height A320 Avionics Engineers Steps

Fixed Height A320 Avionics Engineers Steps

Part No: 812.125.02

Designed for easy access to left or right avionics bays, with additional “Hop -UP” step (400mm) for hangar or ramp conditions.  A robust lightweight aluminium construction ensure the steps are easy

Fixed Height A320 Avionics Engineers Steps 1.25m – with step 0.2m – Towable

Fixed Height A320 Avionics Engineers Steps 1.25m – with step 0.2m – Towable

Part No: 812.125.05

The A320 Avionics Engineer’s Steps are designed to provide easy access to left or right avionics bays, with an additional “Hop -UP” step (200mm) for hangar or ramp access.  The aircraft access

A320 Main Landing Gear Access Platform (towable) Fixed Height

A320 Main Landing Gear Access Platform (towable) Fixed Height

Part No: 812.012.26

The A320 Fixed Height Main Landing Gear Access Platform, is designed to access the wheel bay of an A320 aircraft for servicing of wheel struts. The towable access platform is designed to fit around the

Fixed Height Engine Build & Strip Access Platform Trent 1000 E4 H1.1m

Fixed Height Engine Build & Strip Access Platform Trent 1000 E4 H1.1m

Part No: 812.000.43

The Semmco Fixed Height Engine Build & Strip Access Platform for Trent 1000 E4 H1.1m is designed for easy positioning in and around Trent 1000 engines in horizontal build format. Incorporating a robust

Fixed Height Main Landing Gear Access Platform RH H1.68m

Fixed Height Main Landing Gear Access Platform RH H1.68m

Part No: 812.012.23

The Main Landing Gear Maintenance Platform - Fixed Height, is designed as a platform to allow access to the wheel bay of a range of aircraft for servicing of wheel struts. The platform is designed to fit

Fixed Height UCAS Lite Under Cowl Access Steps with Flip Up Step 1.8m – 2.3m (towable)

Fixed Height UCAS Lite Under Cowl Access Steps with Flip Up Step 1.8m – 2.3m (towable)

Part No: 812.003.00

The Fixed Height UCAS Lite Under Cowl Access Steps with Flip Up Step has been designed for easy access to the engine while the aircaft is on the ramp or in a hanger.   The Flip Up Step will provide a

Variable Height UCAS Wide Under Cowl Access Platform 2.2 – 3.2m (towable)

Variable Height UCAS Wide Under Cowl Access Platform 2.2 – 3.2m (towable)

Part No: 812.350.42

The UCAS wide has been designed for accessing all the service and inspection points in and around the A320, B737 & Embraer aircraft. The UCAS wide has been designed for ramp and airport environment

Variable Height UCAS XS Under Cowl Access Platform 1.75m – 2.5m (towable)

Variable Height UCAS XS Under Cowl Access Platform 1.75m – 2.5m (towable)

Part No: 812.350.05

Designed for accessing engine & service and inspection points in and around B757-767 Embraer 145-175 aircraft.The UCAS XS has been designed for ramp and airport environment requirements with a robust

Variable Height UCAS Narrow Under Cowl Access Steps 2.2-3.2m (towable)

Variable Height UCAS Narrow Under Cowl Access Steps 2.2-3.2m (towable)

Part No: 812.350.11

The Under Cowl Access Steps (UCAS) have been designed for variable height access (2.2-3.2m) in and around wide body aircraft engines to provide easy, safe access for oiling or fan cowl access.Additionally

Variable Height UCAS Narrow Under Cowl Access Steps 2.2-3.2m

Variable Height UCAS Narrow Under Cowl Access Steps 2.2-3.2m

Part No: 812.350.00

The Under Cowl Access Steps (UCAS) has been designed for hangar use with variable height access (2.2-3.2m) in and around wide body aircraft engines for easy safe access for oiling or fan cowls access.

Variable Height UCAS XL Under Cowl Access Steps 2.9m – 4.0m (Towable)

Variable Height UCAS XL Under Cowl Access Steps 2.9m – 4.0m (Towable)

Part No: 812.350.40

Designed for under cowl access to all the service and inspection points in and around the A330 pylon & wide bodied aircraft engine access areas.The  Under Cowl Access Steps (UCAS) XL has been designed

Variable Height UCAS XXL Under Cowl Access Steps 3.0-4.5m

Variable Height UCAS XXL Under Cowl Access Steps 3.0-4.5m

Part No: 812.350.61

The Under Cowl Access Steps (UCAS) has been designed for hangar use with variable height access (3.0-4.5m) in and around wide body aircraft engines for easy safe access for oiling or fan cowls access.Designed

Variable Height UCAS XXL Under Cowl Access Steps 3.5-5.0m Towable

Variable Height UCAS XXL Under Cowl Access Steps 3.5-5.0m Towable

Part No: 812.350.50

The Variable Height UCAS XXL is designed to access all the service and inspection points in and around wide body A330-350 & B777-787 for pylon, engine, wing, windshield & PAX door access to inspection

Fixed Height Towable Universal Access Dornier 328 Maintenance Steps H3.0m

Fixed Height Towable Universal Access Dornier 328 Maintenance Steps H3.0m

Part No: 812.003.50

Multi-use platform on and round Dornier 328 engine, top wing/fuselage panels, leading & trailing wing inspection and navigation lights.Incorporating drop in platform side extension for access to left

Fixed Height Refuelling Access Platform H1.65m (towable)

Fixed Height Refuelling Access Platform H1.65m (towable)

Part No: 812.004.05

A lightweight, compact refuelling system for fast, safe and convenient fuelling of aircraft. Built in modular sections in high grade aluminium, ladders are safe and easily manoeuvrable by one person.

Dual Height Refuelling Steps Towable H1.2m & 1.65m

Dual Height Refuelling Steps Towable H1.2m & 1.65m

Part No: 812.004.08

A lightweight, compact refuelling system for fast, safe and convenient fuelling of aircraft. Built in modular sections in high grade aluminium, ladders are safe and easily manoeuvrable by one person.

HOP UP Towable H1.2m Belly Steps

HOP UP Towable H1.2m Belly Steps

Part No: 812.002.10

Aircraft belly step access Hop UP platform H1.2 X W0.65 X L0.8. Easy to position and manoeuvre in and around aircraft on the line or hangar for safe access into Belly access hatches. Incorporating a robust

HOP UP – B747 Hydraulic Bay Access

HOP UP – B747 Hydraulic Bay Access

Part No: 812.002.11

Designed for use in an around B747 hydraulic bay H0.75 X L0.5 X W0.75. incorporates low level hand rails, “shark’s tooth” non-slip tread on step and platform with lifting handles for

HOP UP General Engine Access Platform 3 steps H0.76m

HOP UP General Engine Access Platform 3 steps H0.76m

Part No: 812.002.13

HOP UP General Engine Access Platform  with 3 steps and working platform H0.76m X L1.3m X W0.6m.Easy to position in and around engines for maintenance and assembly. With a robust lightweight aluminium

HOP UP General Engine Access Platform 4 Step H1.0m

HOP UP General Engine Access Platform 4 Step H1.0m

Part No: 812.002.12

HOP UP General Engine Access Platform  with 4 steps and working platform H1.0m X L1.6m X W0.6mEasy to position in and around engines for maintenance and assembly. With a robust lightweight aluminium construction

HOP UP General Engine Access Platform 7 Step H1.74m

HOP UP General Engine Access Platform 7 Step H1.74m

Part No: 812.002.14

HOP UP General Engine Access Platform 7 Step H1.74m X L2.25m X W0.6mEasy to position and manoeuvre in and around engines incorporating a robust lightweight aluminium construction for ease of manoeuvring

HOP UP Step for A320 Stab Bay Access

HOP UP Step for A320 Stab Bay Access

Part No: 812.002.17

HOP UP Step H0.50 X L0.75 X W0.75m Designed for use with fixed height maintenance steps H2.25m 812.225.01 Providing easy step access to stab bay incorporating slip resistant aluminium platform

HOP UP Working Platform/Step H0.5m

HOP UP Working Platform/Step H0.5m

Part No: 812.002.24

HOP UP Working Platform/step H0.50m X L0.54m X W0.50mDesigned for that extra reach incorporating slip resistant “X-Cut” aluminium step & platform with solid rubber feet pads for anti-slip.Ease

HOP UP Step with hand rails & rubber feet H0.75m

HOP UP Step with hand rails & rubber feet H0.75m

Part No: 812.002.25

HOP UP Working Platform/step H0.75m X L0.80m X W0.60mEasy to position and manoeuvre in and around aircraft, helicopters, trains & engines incorporating a robust lightweight aluminium construction with

HOP UP Steps 0.4m for use with A320 Fan Cowl Platforms

HOP UP Steps 0.4m for use with A320 Fan Cowl Platforms

Part No: 812.002.04

Simple safe easy to use “Hop UP” step designed for use with A320 engine fan cowl steps H0.4 X L0.73 X W0.50.Incorporates location pins which locate & lock on to the fan cowl platform for

Hop-Up Steps Cabin Interior

Hop-Up Steps Cabin Interior

Part No: 812.002.15

Semmco Cabin access steps ergonomically designed for easy access to cabin communications, overhead cabin locker/bins.Lightweight aluminium structure with easy roll castors for effortless safe positioning

B737 APU Platform

B737 APU Platform

Part No: 812.010.10

B737 APU platform for inspection, maintenance and safe removal of APU’s. Designed for hangar use, easy to manoeuvre with a robust steel chassis, lightweight aluminium constructed platform and stair

A320 APU Platform

A320 APU Platform

Part No: 812.010.12

A320 APU platform for inspection, maintenance and safe removal of APU’s. Designed for hangar use, easy to manoeuvre with a robust steel chassis, lightweight aluminium constructed platform and stair

B737 APU Towable Line Maintenance Platform

B737 APU Towable Line Maintenance Platform

Part No: 812.010.13

Designed for safe working on and around APU engines our aircraft stand has lightweight aluminium constructed platform and stair for ease of manoeuvring with slip resistant tread for steps and platform.With

Variable Height Wide Body APU Change Platform H2.75-5.25m

Variable Height Wide Body APU Change Platform H2.75-5.25m

Part No: 812.010.20

The Semmco Variable height APU platform provides safe working at height when changing, inspection or working on and around wide body APU’s and eliminates the existing methodology risks and dangers

A320 Fan Cowl Access Platform H1.1m

A320 Fan Cowl Access Platform H1.1m

Part No: 812.012.00

The A320 Engine Fan Cowl Access platform is a lightweight platform complete with hop-up steps.Designed for engine access carrying out maintenance within a hangar environment on Airbus A320 aircraft, the

A320 Core Cowl Access Platform H1.1m

A320 Core Cowl Access Platform H1.1m

Part No: 812.012.01

The A320 Core Cowl Access platform is a lightweight platform complete with hop-up steps.Designed to access the engine core cowl to carry out maintenance within a hangar environment on the Airbus A320 aircraft,

Fixed Height Engineers Maintenance Steps 1.25m

Fixed Height Engineers Maintenance Steps 1.25m

Part No: 812.125.00

1.25m high Aviation Engineers Maintenance Steps for use in hangar or on ramp - optional tow bar is available.

Fixed Height A320 Avionics Engineers Steps 1.25m – with step 0.2m

Fixed Height A320 Avionics Engineers Steps 1.25m – with step 0.2m

Part No: 812.125.01

Designed easy access to left or right avionics bays, with additional “Hop -UP” step (200mm) for hangar or ramp conditions with a robust lightweight aluminium construction for ease of manoeuvring

Fixed Height Engineers Maintenance Steps 1.75m

Fixed Height Engineers Maintenance Steps 1.75m

Part No: 812.175.00

1.75m high Aviation Engineers Maintenance Steps for use in hangar or on ramp - optional tow bar is available.

Fixed Height Engineers Maintenance Steps 1.5m

Fixed Height Engineers Maintenance Steps 1.5m

Part No: 812.150.00

1.5m high Aviation Engineers Maintenance Steps for use in hangar or on ramp

Fixed Height Engineers Maintenance Steps 2.0m

Fixed Height Engineers Maintenance Steps 2.0m

Part No: 812.200.00

2m high Aviation Engineers Maintenance Steps for use in hangar or on ramp - optional tow bar is available.

Fixed Height Engineers Maintenance Steps 2.25m

Fixed Height Engineers Maintenance Steps 2.25m

Part No: 812.225.00

2.25m high Aviation Engineers Maintenance Steps for use in hangar or on ramp - optional tow bar is available.

Fixed Height Engineers A320 STAB Bay Access Maintenance Steps

Fixed Height Engineers A320 STAB Bay Access Maintenance Steps

Part No: 812.225.01

Designed for hangar or ramp conditions with a robust lightweight aluminium construction for ease of manoeuvring with slip resistant, self-draining tread for stairs and platform incorporating fixed side

Fixed Height Engineers Maintenance Steps 3.0m

Fixed Height Engineers Maintenance Steps 3.0m

Part No: 812.300.00

3.0m high Aviation Engineers Maintenance Steps for use in hangar or on ramp - optional tow bar is available.

Fixed Height Engineers Maintenance Steps 0.75m

Fixed Height Engineers Maintenance Steps 0.75m

Part No: 812.075.00

Designed for hangar or ramp conditions with a robust lightweight aluminium construction for ease of manoeuvring with slip resistant, self-draining tread for stairs and platform incorporating unique sliding

Fixed Height Engineers Maintenance Steps 2.5m

Fixed Height Engineers Maintenance Steps 2.5m

Part No: 812.250.00

2.5m high Aviation Engineers Maintenance Steps for use in hangar or on ramp - optional tow bar is available.

Fixed Height Engineers Maintenance Steps 3.75m

Fixed Height Engineers Maintenance Steps 3.75m

Part No: 812.375.01

Designed for hangar or ramp conditions with a robust lightweight aluminium construction for ease of manoeuvring with slip resistant, self-draining tread for stairs and platform incorporating robust platform

Variable Height Engine D Duct Platform | LH

Variable Height Engine D Duct Platform | LH

Part No: 812.100.73

Variable height “D Duct” platform designed for easy access to wide body engines for service and inspection points in and around wide body fleet, in hangar or base conditions.The variable height

Variable Height Engine D Duct Platform | RH

Variable Height Engine D Duct Platform | RH

Part No: 812.100.74

Variable height “D Duct” platform designed for easy access to wide body engines for service and inspection points in and around wide body fleet, in hangar or base conditions.The variable height

Fixed Height Engine Build & Strip Access Platform

Fixed Height Engine Build & Strip Access Platform

Part No: 812.000.33

Semmco’s Fixed Height Engine Build & Strip Access Platform H3.5m is designed for easy positioning in and around engines in a horizontal build format; with a robust lightweight aluminium construction

Variable Height PAX Door A320 Platform & Wide Body | Sliding Side Rails (L1.5m x W3.0m)

Variable Height PAX Door A320 Platform & Wide Body | Sliding Side Rails (L1.5m x W3.0m)

Part No: 812.645.03

Variable height steps designed for easy access to PAX door, (A320 Family -A330-340-350 B757-767-777-787 Fwd doors) together with service and inspection points in and around narrow & wide body fleet

Fixed Height Engineers Maintenance Steps 1.0m

Fixed Height Engineers Maintenance Steps 1.0m

Part No: 812.100.00

Designed for hangar or ramp conditions with a robust lightweight aluminium construction for ease of manoeuvring with slip resistant, self-draining tread for stairs and platform incorporating unique sliding

Fixed Height Engineers Maintenance Steps 3.25m

Fixed Height Engineers Maintenance Steps 3.25m

Part No: 812.325.00

Designed for hangar or ramp conditions with a robust lightweight aluminium construction for ease of manoeuvring with slip resistant, self-draining tread for stairs and platform incorporating robust platform

Fixed Height Engineers Maintenance Steps

Fixed Height Engineers Maintenance Steps

Part No: 812.350.01

Designed for hangar or ramp conditions with a robust lightweight aluminium construction for ease of manoeuvring with slip resistant, self-draining tread for stairs and platform incorporating robust platform

Fixed Height Engineers Maintenance Platform

Fixed Height Engineers Maintenance Platform

Part No: 812.425.02

Designed for hangar or ramp conditions with a robust lightweight aluminium constructed stair & working platform (W2.0 x L1.6m) for ease of manoeuvring with slip resistant, self-draining tread for stairs

Fixed Height Engineers Maintenance Platform

Fixed Height Engineers Maintenance Platform

Part No: 812.425.03

Designed for hangar or ramp conditions with a robust lightweight aluminium constructed stair & working platform (W2.5 x L2.0m) for ease of manoeuvring with slip resistant, self-draining tread for stairs

Fixed Height Engineers Maintenance Platform

Fixed Height Engineers Maintenance Platform

Part No: 812.450.03

Designed for hangar or ramp conditions with a robust lightweight aluminium constructed stair & working platform (W2.5 x L2.1m) for ease of manoeuvring with slip resistant, self-draining tread for stairs

Variable Height Platform for PAX Door | Sliding Side Rails

Variable Height Platform for PAX Door | Sliding Side Rails

Part No: 812.656.50

Variable height steps designed for easy access to PAX door, all wide body together with service and inspection points in and around narrow & wide body fleet in hangar or ramp conditions.The variable

Variable Height PAX Door A320 Platform & Wide Body | Sliding Side Rails

Variable Height PAX Door A320 Platform & Wide Body | Sliding Side Rails

Part No: 812.645.04

Variable height steps designed for easy access to PAX door, (A320 Family -A330-340-350 B757-767-777-787 Fwd doors) together with service and inspection points in and around narrow & wide body fleet

Variable Height PAX Door A320 Platform & Wide Body | Sliding Side Rails (W1.0 x L2.0m)

Variable Height PAX Door A320 Platform & Wide Body | Sliding Side Rails (W1.0 x L2.0m)

Part No: 812.645.05

Variable height steps designed for easy access to PAX door, (A320 Family -A330-340-350 B757-767-777-787 Fwd doors) together with service and inspection points in and around narrow & wide body fleet

Variable Height PAX Door A320 Platform & Wide Body | Sliding Side Rails

Variable Height PAX Door A320 Platform & Wide Body | Sliding Side Rails

Part No: 812.645.07

Variable height steps designed for easy access to PAX door, (A320 Family -A330-340-350 B757-767-777-787 Fwd doors) together with service and inspection points in and around narrow & wide body fleet

Variable Height Platform for PAX Door and Windshield | Sliding Side Rails | Rotating Top Platform

Variable Height Platform for PAX Door and Windshield | Sliding Side Rails | Rotating Top Platform

Part No: 812.645.08

Variable height steps designed for easy access to PAX door, all narrow body & windshield (Embraer - B737 -A320 family) together with service and inspection points in and around narrow & wide body

Variable Height PAX & Windshield

Variable Height PAX & Windshield

Part No: 812.745.08

Variable height steps designed for easy access to PAX door Embraer, B737 & A320 & windshield (B737 -A320 family) together with service and inspection points in and around narrow & wide body

Variable height platform (1.9-3.25m)

Variable height platform (1.9-3.25m)

Part No: 812.632.52

Variable height steps designed for easy access to PAX door, (Embraer, B737 & A320 fwd door family) together with service and inspection points in and around narrow & wide body fleet in hangar or

Variable Height Maintenance Platform PAX Door

Variable Height Maintenance Platform PAX Door

Part No: 812.632.51

Variable Height Maintenance Platform designed for easy access to PAX door, (A220, A320, B737 & Embraer 145/175) together with service and inspection points in and around narrow & wide body fleet

Variable Height Platform (1.9-3.25m)

Variable Height Platform (1.9-3.25m)

Part No: 812.632.56

Variable height steps designed for easy access to PAX door, (Embraer, B737 & A320 fwd door family) together with service and inspection points in and around narrow & wide body fleet in hangar or

Variable Height Platform (2.5-4.5m)

Variable Height Platform (2.5-4.5m)

Part No: 812.745.03

Variable height steps designed for easy access to PAX door A320 Family -A330-340-350 B757-767-777-787 Fwd doors together with service and inspection points in and around narrow & wide body fleet in

Variable Height Platform (1.9 – 3.25m)

Variable Height Platform (1.9 – 3.25m)

Part No: 812.732.52

Variable height steps designed for easy access to PAX door Embraer B737 A320 Family together with service and inspection points in and around narrow & wide body fleet in hangar or ramp conditions.The

A320 Wheel Bay/Well Fixed Height Access Platform

A320 Wheel Bay/Well Fixed Height Access Platform

Part No: 812.012.32

The Semmco A320 Wheel Bay/Well Access platform is a lightweight platform, designed to allow access to the wheel bay/well of Airbus A320 aircraft.The platform is constructed from robust and lightweight

Multiple Leg Access Platform

Multiple Leg Access Platform

Part No: 812.012.36

The A330 / A340 / A380 Multiple Leg Access is designed to as an engineer’s platform for gaining access to and undertaking service and maintenance on wheel struts and to provide wheel bay access on the

Fixed Height Over Wing Door 3 Access Platform

Fixed Height Over Wing Door 3 Access Platform

Part No: 812.011.02

Innovatively designed and tested to provide safe access to the over wing door on B777, 747 and A380 during escape slide service and replacement.Constructed from lightweight aluminium the platform is easy

Fixed Height Crown Skin Access Platform

Fixed Height Crown Skin Access Platform

Part No: 812.011.00

The Fixed Height Crown Skin Access platform consists of two access platform modules which can be used independently or together over the wing to provide excellent safe working at height area for engineers 

B737 Fixed Height Cargo Bay Maintenance Steps

B737 Fixed Height Cargo Bay Maintenance Steps

Part No: 812.125.04

Designed for hangar or ramp conditions with a robust lightweight aluminium construction for ease of manoeuvring with slip resistant, self-draining tread for stairs and platform incorporating B737 fuselage

Variable Height Wide Body Cargo Bay Platform

Variable Height Wide Body Cargo Bay Platform

Part No: 812.101.08

The Variable Height Cargo Bay platform is designed for easy access to narrow body cargo/freight bays for service and inspection on and around the door and door seal for wide body fleet in the hangar.The

Variable Height Cargo Bay & Working Platform

Variable Height Cargo Bay & Working Platform

Part No: 812.732.57

Variable height steps designed for safe access to Cargo Bay (wide body family) with easy fold out (locking) side barriers providing fall protection within cargo bay aperture for use in hangar or base conditions.

Bulk cargo Bay A320 Variable height 1.7-3.0m

Bulk cargo Bay A320 Variable height 1.7-3.0m

Part No: 812.630.01

Variable height steps designed for easy access to Bulk cargo bay door A320 family (On & Off jacks) together with service and inspection points in and around narrow & wide body fleet in hangar or

Variable Height Bulk Cargo Bay & Working Platform H2.5-3.7m

Variable Height Bulk Cargo Bay & Working Platform H2.5-3.7m

Part No: 812.737.00

Variable height steps designed for safe access to bulk bay (A330-350 B777-787) with easy slide side railings have 50mm incremental adjustment to ensure the bulk bay aperture is fully protected. The platform

Variable Height Wide Body Cargo Bay & Bulk Bay Access Platform L/H

Variable Height Wide Body Cargo Bay & Bulk Bay Access Platform L/H

Part No: 812.101.13

A working platform for maintenance and access to the cargo/freight bay for a wide range of aircraft

Variable Height Cargo Bay Access Platform 2.4m-3.4m R/H

Variable Height Cargo Bay Access Platform 2.4m-3.4m R/H

Part No: 812.101.07

Variable height Cargo Bay platform designed for easy access to wide body cargo bays for easy access into cargo/ freight bay for service and inspection on and around the door and door seal for wide body

Variable Height Cargo Bay Access Platform 1.8m-2.8m R/H

Variable Height Cargo Bay Access Platform 1.8m-2.8m R/H

Part No: 812.101.09

Variable height Cargo Bay platform designed for easy access to narrow body cargo bays for easy access into cargo/freight bay for service and inspection on and around the door and door seal for wide body

Variable Height Cargo Bay Access Platform H2.4m – 3.4m

Variable Height Cargo Bay Access Platform H2.4m – 3.4m

Part No: 812.101.06

Variable height Cargo Bay platform designed for easy access to wide body cargo bays for easy access into cargo/ freight bay for service and inspection on and around the door and door seal for wide body

Hercules Maintenance Access Platform

Hercules Maintenance Access Platform

Part No: Bespoke product

This Maintenance Access Platform is for use in the hangar.   Constructed from lightweight, compact and variable high grade aluminium sections and corresponding joints and components, the platform provides

Typhoon Maintenance Access Platform

Typhoon Maintenance Access Platform

Part No: Bespoke product

This Typhoon Maintenance Access Platform provides easy access to cockpit and installation points of both single seater and two seater aircraft.The height of the platform is easily adjusted using the hydraulic

Nose to Tail Docking Systems

Nose to Tail Docking Systems

Part No: Bespoke product

Nose docking solutions, fixed or mobile, manufactured from high grade lightweight aluminium with wide and narrow working platforms, fixed or sliding finger nose profiles and multi aircraft type functionality.

EcoLift Access Platform

EcoLift Access Platform

Part No: 821.400.06

The EcoLift Access Platform is a non-powered, compact, lightweight, push around variable height access platform. It is a safe, practical and cost effective alternative to step ladders, platform steps and podiums.

Peco Variable Height Access Platform

Peco Variable Height Access Platform

Part No: 821.400.00

The Peco Variable Height Access Platform is a non-powered, compact, lightweight, push-around, variable height access platform. It is a safe, practical and cost effective alternative to step ladders, platform steps and podiums.

Complete the form below to request a quote for .
Please confirm you're human.