You searched for:
Handrail with toe board – for use with Semmco Pit Boards

Handrail with toe board – for use with Semmco Pit Boards

Part No: 813.007.01

Aluminium hand rail with toe board.These fit easily into location pockets with security pins and are...

Handrail with Pit Access Step Ladder for use with Semmco Pit Boards

Handrail with Pit Access Step Ladder for use with Semmco Pit Boards

Part No: 813.007.02

Aluminium hand rail with integral hand rails for safe access on to centrally mounted pit ladder.The hand...

Gates “Lift & Lock” for use with Pit Boards

Gates “Lift & Lock” for use with Pit Boards

Part No: 813.007.04

Gates “lift & Lock” for use at either end of the handrail (813.007.01) providing a safe...

Rail Pit Access Pit Board 1m wide

Rail Pit Access Pit Board 1m wide

Part No: 813.007.05

The Pit Board is designed to create a “bridge” to ensure safe and easy method of passage...

Rail Pit Board Connecting Plate

Rail Pit Board Connecting Plate

Part No: 813.007.08

Aluminium connecting plate to join two pit boards together and provide a safe walkway between the two...

Rail Pit Board 1.2m wide

Rail Pit Board 1.2m wide

Part No: 813.007.20

The Pit Board is designed to create a “bridge” to ensure safe passage over depot pits or...

Rail Pit Board

Rail Pit Board

Part No: 813.007.59

The Pit Board is designed to create a “bridge” to ensure safe passage over depot pits or...

Typhoon Maintenance Access Platform

Typhoon Maintenance Access Platform

Part No: Bespoke product

This Typhoon Maintenance Access Platform provides easy access to cockpit and installation points of both...

Working at Height Compliance: Is Your Rail Depot Audit-Ready?

Working at Height Compliance: Is Your Rail Depot Audit-Ready?

When GB Railfreight rolled out its Work Safe = Home Safe campaign, it drove home a reality every depot...

The Cost of Stop-Start Electrification: Planning Rail Depot Access for an Uncertain Fleet Mix

The Cost of Stop-Start Electrification: Planning Rail Depot Access for an Uncertain Fleet Mix

If you have spent more than a decade managing fleet maintenance or engineering strategy in UK rail, you...

Every Minute on the Stand: How Access Design Becomes a Hangar-Throughput Lever in the 2026 Capacity Crunch

Every Minute on the Stand: How Access Design Becomes a Hangar-Throughput Lever in the 2026 Capacity Crunch

The global aviation industry is entering a decade defined not simply by aircraft demand, but by maintenance...

Complete the form below to request a quote for .
Please confirm you're human.